
When upstairs walls miss the floor below
Strongbacks, shear blocks and floor trusses on double storey Manor Lakes frames.
The membrane, steel and pipes under your floor, checked the day before they disappear.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
On one Manor Lakes slab in August 2025 we recorded mesh touching service pipes, trimmer bars missing at cut mesh, an extra shower recess bar left out and a hot water service pad with no membrane or isolation strip. That is a normal list for a busy site, and every item was cheap to fix with the steel fixer still there. The next morning it would have been under concrete.

Annotated findings from Slab pre-pour inspections.




1Bored piersHoles drilled and cages placed, concrete not yet ordered
3FrameWalls, trusses and upper floor framed, roof cover on, no linings
4Lock-up (pre-plaster)Roof, windows, cladding and external doors done, before plaster
5FixingDoors, architraves, skirtings and cabinets fitted, before painting
6WaterproofingMembrane cured in wet areas, no tiles laid
7Pre-handover (PCI)Two to three weeks before the handover date
Strongbacks, shear blocks and floor trusses on double storey Manor Lakes frames.

What sarking does, why it goes missing and why lock-up is when to catch it.

Hot water service pads, and the membrane and isolation strip they need.
Instant online pricing, or talk to the booking team on 1300 471 805.
Because it is a slab too. Without a membrane or the isolation strip the engineer specified, damp and movement show up years later at a fitting that is expensive to move.
The surveyor's mandatory inspection serves the permit. Ours is a detailed defect inspection for you, and it looks at things like clearance to pipes and bar laps that are easy to pass by.
We move with it. Tell us the new date as soon as you know and there is no charge for rebooking.
Only the surface and edges. Everything beneath, including the membrane and the steel cover, can only be seen before the pour.
The slab engineering and the plumbing set-out if you have it, so bar positions and penetrations are compared with what was designed.
Concrete strength testing, soil testing, plumbing pressure tests and engineering certification.