Slab pre-pour inspection in Manor Lakes

The membrane, steel and pipes under your floor, checked the day before they disappear.

  • Steel tied and formwork up, the day before the pour
  • About 1 hour on site
  • Report within 24 hours
Price your inspectionLeave your details and a Manor Lakes inspector calls you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookSteel tied and formwork up, the day before the pour
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Manor Lakes slab pre-pour inspection

  • Vapour barrier running under every beam to ground level
  • Laps taped and punctures sealed
  • Bar chairs at the spacing that holds cover
  • Mesh tied up where it sags
  • 25 mm clear of service penetrations
  • Trimmer bars wherever the top mesh is cut
  • Extra bars the engineer specified, such as at showers
  • Edge and internal beam widths
  • Pod spacing and spacers
  • Drainage pipes capped and undamaged
  • Hot water service pad membrane and isolation strip
  • Formwork line, bracing and set-down for wet areas
  • Termite collars at penetrations where specified
Why it matters here

Slab pre-pour inspections on Manor Lakes builds

On one Manor Lakes slab in August 2025 we recorded mesh touching service pipes, trimmer bars missing at cut mesh, an extra shower recess bar left out and a hot water service pad with no membrane or isolation strip. That is a normal list for a busy site, and every item was cheap to fix with the steel fixer still there. The next morning it would have been under concrete.

What we find at this stage in Manor Lakes

  • Mesh in contact with service pipes
  • Trimmer bars missing where mesh was cut
  • Engineer's extra bars left out
  • Barrier stopping short of the edge beams
  • Hot water service pad without membrane
Drainage pipes left open, so rubble can fall in before the pour, found during a slab pre-pour inspection in Manor Lakes
Drainage pipes left open, so rubble can fall in before the pour
Sample findings

Sample defects found during our slab pre-pour inspections in Manor Lakes

Annotated findings from Slab pre-pour inspections.

Vapour barrier draped over the reinforcement instead of lying beneath it, found during a slab pre-pour inspection in Manor Lakes
Vapour barrier draped over the reinforcement instead of lying beneath it
No damp proof membrane under the small hot water service slab, found during a slab pre-pour inspection in Manor Lakes
No damp proof membrane under the small hot water service slab
Trimmer bars missing around a penetration where the top mesh had been cut, found during a slab pre-pour inspection in Manor Lakes
Trimmer bars missing around a penetration where the top mesh had been cut
Beam narrower than the plans where pods had shifted without spacers, found during a slab pre-pour inspection in Manor Lakes
Beam narrower than the plans where pods had shifted without spacers

The other stages of a Manor Lakes build

  1. Bored piers inspection in Manor Lakes1Bored piersHoles drilled and cages placed, concrete not yet ordered
  2. Frame inspection in Manor Lakes3FrameWalls, trusses and upper floor framed, roof cover on, no linings
  3. Lock-up (pre-plaster) inspection in Manor Lakes4Lock-up (pre-plaster)Roof, windows, cladding and external doors done, before plaster
  4. Fixing inspection in Manor Lakes5FixingDoors, architraves, skirtings and cabinets fitted, before painting
  5. Waterproofing inspection in Manor Lakes6WaterproofingMembrane cured in wet areas, no tiles laid
  6. Pre-handover (PCI) inspection in Manor Lakes7Pre-handover (PCI)Two to three weeks before the handover date

All construction stage inspections in Manor Lakes →

Guides

Construction stage guides for Manor Lakes

All guides →

Book a slab pre-pour inspection in Manor Lakes

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Slab pre-pour inspections in Manor Lakes: common questions

Why check something as small as the hot water service pad?

Because it is a slab too. Without a membrane or the isolation strip the engineer specified, damp and movement show up years later at a fitting that is expensive to move.

Does the building surveyor not check the slab?

The surveyor's mandatory inspection serves the permit. Ours is a detailed defect inspection for you, and it looks at things like clearance to pipes and bar laps that are easy to pass by.

What if the pour date changes?

We move with it. Tell us the new date as soon as you know and there is no charge for rebooking.

Can you check the slab after it is poured?

Only the surface and edges. Everything beneath, including the membrane and the steel cover, can only be seen before the pour.

What should I send you?

The slab engineering and the plumbing set-out if you have it, so bar positions and penetrations are compared with what was designed.

What is not included?

Concrete strength testing, soil testing, plumbing pressure tests and engineering certification.