Waterproofing inspection in Manor Lakes

Membranes in the bathrooms, ensuite and laundry, checked before a single tile is laid.

  • Membrane cured in wet areas, no tiles laid
  • About 1 hour on site
  • Report within 24 hours
Price your inspectionLeave your details and a Manor Lakes inspector calls you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane cured in wet areas, no tiles laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Manor Lakes waterproofing inspection

  • Substrate is a water resistant board, not bare particleboard
  • Membrane height on shower walls
  • Floor coverage to the whole wet area
  • Bond breakers at wall and floor junctions
  • Membrane under door jambs and architraves
  • Puddle flanges at floor wastes
  • Penetrations sealed at taps and outlets
  • Even film without lumps that lift tiles
  • Damage or punctures before tiling
  • Bath hob or set-down formed
  • Membrane protected from other trades
  • Upstairs wet areas given extra attention
Why it matters here

Waterproofing inspections on Manor Lakes builds

An upstairs ensuite in Manor Lakes sits directly over a living room or garage, so a membrane failure there means a stained ceiling below. In July 2026 we found membrane brushed straight onto particleboard flooring in a first floor wet area, a substrate the Housing Provisions do not accept for that use. On other jobs the membrane had been damaged by foot traffic or left in lumps on the walls. Once tiled, none of this can be seen.

What we find at this stage in Manor Lakes

  • Membrane on unsuitable particleboard
  • Damage before tiling
  • Lumps of membrane on shower walls
  • Membrane missing under door jambs
  • Bath hob not formed
Membrane left exposed to boots and other trades before tiling, found during a waterproofing stage inspection in Manor Lakes
Membrane left exposed to boots and other trades before tiling
Sample findings

Sample defects found during our waterproofing inspections in Manor Lakes

Annotated findings from Waterproofing inspections.

The same upstairs floor, with no water resistant substrate under the membrane, found during a waterproofing stage inspection in Manor Lakes
The same upstairs floor, with no water resistant substrate under the membrane
Membrane damaged before tiling, so it must be repaired first, found during a waterproofing stage inspection in Manor Lakes
Membrane damaged before tiling, so it must be repaired first
Lumps of membrane on shower walls that would push the tiles out, found during a waterproofing stage inspection in Manor Lakes
Lumps of membrane on shower walls that would push the tiles out
Membrane not taken under the door jambs and architraves, found during a waterproofing stage inspection in Manor Lakes
Membrane not taken under the door jambs and architraves

The other stages of a Manor Lakes build

  1. Bored piers inspection in Manor Lakes1Bored piersHoles drilled and cages placed, concrete not yet ordered
  2. Slab pre-pour inspection in Manor Lakes2Slab pre-pourSteel tied and formwork up, the day before the pour
  3. Frame inspection in Manor Lakes3FrameWalls, trusses and upper floor framed, roof cover on, no linings
  4. Lock-up (pre-plaster) inspection in Manor Lakes4Lock-up (pre-plaster)Roof, windows, cladding and external doors done, before plaster
  5. Fixing inspection in Manor Lakes5FixingDoors, architraves, skirtings and cabinets fitted, before painting
  6. Pre-handover (PCI) inspection in Manor Lakes7Pre-handover (PCI)Two to three weeks before the handover date

All construction stage inspections in Manor Lakes →

Guides

Construction stage guides for Manor Lakes

All guides →

Book a waterproofing inspection in Manor Lakes

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Manor Lakes: common questions

Why is particleboard a problem under a membrane?

Particleboard swells when it gets wet. In a wet area the substrate needs to be a material suited to it, so the membrane has something stable to sit on.

Is there any way to check a membrane once the tiles are on?

Only indirectly, by running water and watching for leaks at handover. The membrane itself can only be seen before tiles.

Do you test the membrane?

We inspect it visually and check coverage, heights and details against AS 3740. We do not flood test or cut samples.

Is this inspection only for upstairs bathrooms?

No, every wet area is included. Upstairs ones simply have more to lose if they fail.

How quickly do I need to call?

As soon as the waterproofer is booked. The tiler often follows within a day.

What is not included?

Flood testing, plumbing pressure tests and destructive sampling of the membrane.